日韩中文字幕视频原创-乱荡一区二区三区视频-青青视频app下载-黄色在线看免费观看-日韩欧美在线免费观看一区-欧美日韩乱一区二区三区-成年午夜av在线免费观看-小黄片午夜视频在线播放-久久精品人妻中文av

Contact Us

Cross Flow Fan Installation and maintenance requirements

Date: 2016-5-13   Click: 1883 Times

1, "Cross Flow Fan" ambient temperature should be 75ºC ≥ -40ºC.
2, industrial gas through the cooling fan does not allow strong acid, alkali and various solutions.
3, does not allow dust and other debris fall into the fan, so as to avoid burning and fan blades break.
4, "Cross Flow Fan" before installation should first check whether the damage caused due to packing and shipping, deformation, if damaged or deformed should be repaired after installation.
5, and then check the "Cross Flow Fan" all parts and screws are loose; whether touching or displacement between the blade and duct before installation if the touching or the shift should be adjusted. To replace the fan products from different manufacturers, you need to measure fan site size holes.

Back to: Industry news

+86-0769-83660708

Home Product News Contact